Coordinate Contractor Risk Before Work Starts
Coordinate host and contractor controls before non-routine work begins.
Shared site Roof repair begins above active packaging while both employers assume the other handled the interface. The risk lives between organizations, not inside either permit alone. Interface control Make host hazards, contractor hazards, simultaneous operations, and verification owners explicit before work. Assume each party knows Fast, but gaps stay hidden Work starts with shared control, not shared assumptions Coordination converts multi-employer assumptions into named controls. Hazard exchange Start The contractor is ready to climb. What do you do first? Simultaneous operations Overlap Forklifts are still using the aisle below. Which control is strongest? Verification
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in