Build a Control Plan That Survives Monday
Select practical Control-plan choices for metric, signal, and reaction response.
Monday drift Transfer errors fell after Improve, then crept back after staffing and routing changes. Without a reaction plan, the team either tampers with noise or misses special-cause drift. Measure -> Signal -> React Control plan spine A Control plan should state the measure, frequency, signal rule, owner, response action, and effectiveness check. Dashboard Watch the number monthly. The process owner knows what to do before the defect returns. A signal without a response is only a warning label. 01 Metric 02 Signal 03 Reaction Choose the monitored metric Decision 1
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in