Control Is a Reaction Plan
Write a Control-phase reaction plan that names metric, signal, owner, and response.
Control is not prove we improved. Control is know what happens when the process starts drifting. Name The Measure Choose the process output or critical input that should stay stable after Improve. Define the unit, frequency, data source, and owner. If the metric is too broad, the signal arrives late. Define The Signal A signal is not every movement. It is a rule that says the process may have changed: a point beyond a control limit, a run pattern, a threshold breach, or a repeated miss. The rule should be written before the data arrives. Write The Response A Control…
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in