Skip to main content
SLIPS-TRIPS-FALLS5 MIN READ

Walk The Loading Dock Decision

Apply a sequence of loading-dock decisions that control wet surfaces and obstructions before traffic resumes.

Dock 3 Rain has blown onto the ramp edge, pallets are staged near the door, and a truck is waiting. The hazard is not one thing. It is wet footing plus clutter plus moving equipment. The sequence Close, separate, reopen Control exposure first, separate people from equipment second, and reopen only when the walking surface is safe. OSHA 1910.22 requires hazardous walking-working surfaces to be corrected or guarded before use. The hierarchy of controls favors route separation over warnings. 01 Wet edge 02 Pallet staging 03 Reopen Step 1 The ramp edge is wet where pedestrians usually cross. What is…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us