Quick Reference for Inspection Readiness
Recall inspection-readiness checks and the reasoning behind each.
State check Installed versus inspection-ready Use inspection-ready as a distinct gate. Common trap 'The system is done, so schedule inspection now.' Install is physically complete but closeout evidence may not be verified. Your line Let's run the inspection-ready gate first: permit, labels, photos, access, and AHJ notes. Then we schedule. Equating finished work with inspectable work. It protects the customer from a failed visit caused by missing evidence rather than bad installation. Closeout recall READY What does READY check before inspection? Recall Which closeout photo is most often useless? The blurry proof photo. A photo that cannot prove label placement,…