Walk the Site Survey Gate
Use A3 thinking to frame site-survey gaps as facts, countermeasures, and evidence.
Gate pressure Design has a partial survey packet and a customer expecting a final design by tomorrow. If missing facts pass the gate, they reappear as permit corrections, truck rolls, or change orders. A3 thinking Frame the gap before forcing the flow A3 uses current condition, gap, cause, countermeasure, and evidence to keep problem solving grounded in facts. Shortcut Guess, submit, and hope design can fix it later. The gate protects downstream work without turning into bureaucracy. Stop hidden risk at the gate; move honest uncertainty into a named recovery path. 01 Proceed? 02 Recover 03 Prevent Proceed or pause…
Sign up free — one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in