Design a solar WIP board with stages, WIP limits, and aging signals.
Solar jobs are moving through many functions, but the team cannot see where work is aging or overloaded. Visualize the workflow, limit WIP, and expose blockers. The common trap is making a board with columns but no WIP limits or aging signals. That shows where work sits, but not whether the system is overloaded or stuck. Before Department lists: design spreadsheet, permit tracker, install calendar, PTO emails. No shared aging signal. After One board: Contracted -> Finance clear -> Survey complete -> Design -> Permit -> Ready to install -> Installed -> Inspection -> PTO, with WIP limits, blocked tags,…