Skip to main content
WATER-UTILITY-MANAGEMENT5 MIN READ

Commit to one leak-reduction PDSA

Commit to a specific PDSA test for reducing water loss or avoidable field demand.

Plan one PDSA test for a leak, meter, pressure, or flushing improvement in a real water utility context. A small water-loss or service-improvement test that can be reviewed within one week. I will test [change] in [specific DMA/route/pressure zone] on [date]. I predict [measurable result] because [reason]. I will measure [metric 1] and [metric 2]. I will study the result on [date/time] and decide whether to adapt, scale, or stop. In 2 days, confirm whether the PDSA test is scheduled, running, or blocked, and whether the predicted measure was written before the test started. A district metered area with elevated…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us