Skip to main content
WATER-UTILITY-MANAGEMENT5 MIN READ

Coach the valve miss without blaming the crew

Use Five Whys coaching to investigate a missed valve isolation without stopping at blame.

Crew Lead Marco ML Night repair crew lead 1 Impact 2 Why 3 Control After the miss 20 sec Valve isolation review The wrong valve was closed, a school-zone outage ran 45 minutes longer, and the crew is defensive. A blame review may feel decisive but leaves the same trap in the system. 45 min added outage time school zone affected 10 min

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us