The reframe: Gate congestion is a process-boundary problem before it is a lane-count problem. Suppliers and inputs List who provides the information, cargo status, equipment, driver credentials, releases, and yard locations the process needs. Process and outputs Keep the process high level. Five to seven steps are enough to see whether the issue is validation, exception handling, physical movement, or yard acceptance. Constraints and measures Name the constraint and the measure together. A kiosk bottleneck needs transaction time. A release-data defect needs pre-arrival error rate. A yard-slot issue needs available-slot visibility.
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in