sort-buckets control-pyramid score-chips Sort each mining control by its strongest hierarchy level. Elimination or substitution Engineering control Administrative control PPE Remove manual chute clearing by installing remote clearing equipment Use a less hazardous reagent in the plant where technically feasible Separate light vehicles from haul trucks with a dedicated physical roadway Require a radio call before entering the active dump approach Wear high-visibility clothing in the mobile-equipment area Cancel an unnecessary confined-space entry by relocating the sample point Use a documented permit and pre-job briefing for conveyor work Wear respiratory protection during temporary dust exposure
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in