risk-context decision-trail control-reset Changed condition Water flow from the face increases while the crew is preparing to keep drilling. The original task plan no longer fully describes the job. Dynamic risk When conditions change, reset the task controls before continuing. Risk management is dynamic. A JSA is only current if it reflects the actual task, environment, and controls. Push on Treat water as cleanup after the round. The crew controls the change instead of discovering it by failure. A changed condition is new information, not an inconvenience. 01 Pause 02 Assess 03
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in