Place each control in the hierarchy bucket. Elimination/Substitution Engineering control Administrative control PPE Stop cutting the material on site by ordering pre-cut panels Use a lower-dust material for the same application Install local exhaust ventilation at the saw Add a fixed guard and dust hood Rotate workers to reduce exposure time Schedule cutting when fewer workers are nearby Require fit-tested respirators for remaining exposure Use safety glasses during cutting
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in