Downtime hit A filler fault removes 95 scheduled minutes from Line 3 before lunch. The plan can still recover, but only if the lost availability is treated as real. Recovery loop Recalculate -> choose recovery -> check quality -> prevent repeat OEE names what was lost. PDCA keeps the recovery from becoming another source of loss. Shortcut Run faster and hope output catches up. A recovery plan that protects shipments and avoids repeated faults. Recovery is a controlled planning cycle, not a heroic speed-up. 01 Loss 02 Recovery 03 Check OEE lens The line lost 95 scheduled minutes. The remaining…
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in