PFMEA line vs. control-plan line: what is the difference? Compare If you cannot trace one to the other, the system has a gap. What should a high-risk PFMEA cause trigger in the control plan? A prevention or detection control with method, frequency, responsibility, record, and reaction plan. Risk without a production control is only analysis. The operator already knows to watch that feature. Planning review objection Response If the feature matters enough for the PFMEA, the control plan should show how we watch it, how often, and what happens when it fails. Do not accept tribal knowledge as a control.…
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in