Skip to main content
Public lesson library

Forced choice lessons

Choose between competing responses before reading the explanation. Compare the trade-offs rather than looking for a familiar phrase that sounds right.

Lesson previews

Scope the new queue request before saying yes

A new queue is not just more contacts. It is a service design decision with requirements, risks, staffing, quality, and reporting implications.

5 min
When the decoder drifts mid-demo

The demo is live. Two wrong selections happen in five trials. The participant says they are still using the same imagery. The signal monitor shows mild jaw tension and rising impedance on one electrode.

5 min
Choose the modality by risk, not by prestige

A rehab clinic wants a six-month communication pilot for adults with severe motor impairment. The goal is dependable yes/no and short phrase selection at home with caregiver setup. Funding starts next quarter, and the clinic has no surgical pathway.

5 min
False positive or missed intent?

A home BCI controls three actions: turn on a lamp, tilt a bed, and unlock a door. Offline separation is moderate, and the participant strongly values independence but fears accidental movement at night.

5 min
Choose API, browser agent, or human work

RICE is a prioritization lens: high reach and impact only matter when confidence is high enough and effort is justified. For browser automation, confidence and effort usually punish UI-only approaches when a stable API exists.

5 min
Add approval where failure is expensive

FMEA turns vague risk into a gate decision. High severity plus low detectability means the agent should prepare evidence and stop before the action.

5 min
Respect the automation boundary

Risk management starts by mapping what the control protects. A browser agent should never be instructed to bypass anti-abuse or authentication boundaries.

5 min
Do not patch the selector first

Five Whys helps separate a broken locator from a broken assumption. The first action should preserve evidence and inspect page state before patching.

5 min
Decide: emergency fund versus debt payment

The starter-buffer plan names the trade-off and protects against new debt while still keeping the debt plan alive.

5 min
Decide: the overdraft first move

Mapping first is strongest because it turns overdraft shame into evidence. The coach can then choose a timing, buffer, bill-order, or spending intervention that fits the actual pattern.

5 min
Decide: partner conflict without taking sides

The strong line reflects both values and moves to a small shared rule. It avoids taking sides while still creating structure.

5 min
Decide: coaching variable income

The bare-minimum plus surplus-rule approach fits the actual volatility. It gives low weeks and high weeks pre-decided jobs.

5 min
Choose the right supplier move

The additive is small in spend but high in supply risk because the line cannot run without it. This is a bottleneck or strategic-risk situation, so assurance of supply beats a price-first reaction.

5 min
Decide whether to ship a borderline batch

Peel strength is tied to field adhesion. Because the consequence is severe and installers may not detect the issue until after installation, the batch needs containment and investigation before customer release.

5 min
Defend margin without losing the spec

The buyer has power, but the specifier and tested system still create differentiation. The best move trades value for commitment instead of giving an unconditional rebate.

5 min
Protect the customer promise when supply breaks

The situation mixes record accuracy, inbound supply, and fulfillment capacity. SCOR thinking says confirm each process before promising a full delivery.

5 min
Answer the CFO's "why now?"

The strongest answer turns urgency into a causal timing case. PESTLE helps identify the trigger, but the business case must connect it to internal impact and the approval window.

5 min
Keep sunk costs out of the decision

The next-funding decision should use incremental future value. Past spend may inform risk, but it cannot justify continuation by itself.

5 min
Choose pilot, phased rollout, or full approval

Leon has large potential value but low confidence in two key assumptions. The best move is to ask for evidence-buying approval, not full release or endless delay.

5 min
Use ROI for shorthand, NPV for decisions

Different metrics answer different questions. For multi-year investment decisions, discounted net value is usually the better decision anchor, with ROI and payback as supporting views.

5 min
Choose the first hour move in a billing outage

Billing automation is failing for 18,000 subscriptions. Engineering is investigating, Finance estimates a cash-risk threshold at four hours, and Support is already seeing renewal questions from enterprise customers.

5 min
Push back when everything is critical

The executive team wants 41 activities classified as Tier 1. Recovery staff, backup tooling, and alternate workspace capacity cannot support 41 simultaneous restorations within four hours.

5 min
When the office is closed, protect the activity

Headquarters is inaccessible for at least one business day. Customer onboarding has 38 scheduled go-live calls, Support queues open at 9 a.m., and Facilities cannot estimate reentry yet.

5 min
Do not confuse supplier sympathy with continuity

A sole packaging supplier has a warehouse fire. Your customer cutoff is 3 p.m., regulated shipments cannot use unlabeled substitutes, and the supplier cannot yet confirm capacity.

5 min

Skill catalogue | Browse the library

Put it into practice

Choose your next learning habit.

Contact us