Three throat signals have dropped to red at 07:12. Two inbound trains are approaching controlled signals, the platform crowd is rising, and engineering has not yet confirmed fault extent.
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in