Skip to main content

Stock spare parts by failure risk

Prioritize spare-part stocking by severity, occurrence, and detectability rather than by habit.

bowling-alley-management6 min read

Decide whether to keep extra pin elevator belts on site when shelf space is tight and the part has only failed twice in six months. FMEA-lite: score severity, occurrence, and detectability before choosing the stocking rule Ordering by recency makes the last failure feel like the biggest risk, even when a less frequent failure would close more lanes or create a safety exposure. Severity Lane closure during weekend rush = severity 5 out of 5 because the guest impact is immediate and capacity drops. Severity asks what happens if the failure reaches the guest or staff. A cheap part can…

Read the full lesson

Sign up free: one personalized lesson every day, matched to your role and goals.

← Back to library

Contact us