Run one small PDCA trial on a recurring glass defect or process loss. Choose a defect, line, shift, product family, or support process where you can observe the result within two or three days. I will test [specific change] on [line/task/product] during [time window] to reduce [defect/loss metric] while watching [side effect]. I will check the result by [date/shift] and decide whether to standardize, reverse, or run another PDCA cycle. Follow up in three days with the metric, what changed, and whether the standard needs updating. After the next mold change on a container line where first-hour rejects usually rise…
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in