The bearing kit has stocked out twice. Weekly demand is about one kit, lead time moved from 5 to 14 days, and the current reorder point is 2. The team needs a parameter change that fixes timing and protects cash.
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in