Elena E Contractor lead 1 Scope 2 Interface 3 Stop trigger Pre-job 5:00 Before cut The permit is signed, but adjacent pedestrian traffic has changed. The live site can invalidate a clean permit. Site-task exchange The host brings site hazards; the contractor brings task hazards; together they define controls and stop triggers. Read the rules One-way compliance
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in