Place each control in the correct hierarchy bucket. Elimination Substitution Engineering control Administrative control PPE Stop doing the solvent wipe by buying pre-cleaned parts Replace solvent-based paint with water-based paint after compatibility review Install local exhaust at the mixing bench Rotate workers to limit time in the exposure area Require fitted respirators during the task Use a fixed guard that blocks access to the pinch point
Read the full lesson
Sign up free: one personalized lesson every day, matched to your role and goals.
Already have an account? Sign in