Risk Management
Identifying, assessing, and mitigating business risks including operational, financial, and strategic threats. Develops contingency plans, establishes controls, and ensures organizational resilience through proactive risk monitoring.
Lesson previews
A 2 to 8 C load departed before trailer pre-cool was verified. The deviation draft says the driver was reminded, but the loading process still permits the same failure. 5 Whys finds the process cause; PDCA tests and standardizes the fix. CAPA needs root cause, corrective action, preventive action, and effectiveness evidence. Common trap: close with training because it is fast. Training may be necessary, but it is weak when the process still allows loading without evidence. Before Root cause: driver forgot. CAPA: remind driver to pre-cool trailer. After Root cause: loading could start without pre-cool evidence in dispatch workflow.…
5 minBuild a lane risk register that changes decisionsThe register says Temperature excursion - medium for a biologics lane with ferry dwell and summer heat. It does not tell anyone what to watch or do. ISO 31000 in lane language: identify the specific uncertainty, analyze consequence, treat it with controls, and assign monitoring ownership. Common trap: write the outcome as the risk. Temperature excursion names the bad result, but it hides cause, trigger, owner, and treatment. Before Risk: temperature excursion. Rating: medium. Mitigation: monitor shipment. After Cause: missed 08:30 ferry after late warehouse release. Consequence: passive shipper may exceed qualified hold time. Controls: 06:00 release cutoff, live logger,…
5 minCalculate a packout buffer before you shipPassive shipper qualified for 96 hours. Planned route is 78 hours. Credible customs dwell can add 28 hours. Product must stay 2 to 8 C until controlled receipt. FMEA asks what failure mode appears if route time exceeds the packaging envelope, then selects controls that reduce likelihood, consequence, or detection gap. Common trap: calling 18 hours of arithmetic margin a real buffer while ignoring credible customs dwell and rescue time. Before 96-hour qualified shipper minus 78-hour plan equals 18-hour buffer. Approve passive packout. After 96-hour qualified shipper minus 78-hour route minus 28-hour credible customs dwell equals negative 10 hours. Passive…
5 minChoose the safer control, not the louder ruleA reported irritation is a potential exposure event. The response must control the hazard, not just repeat a PPE rule.
5 minRun a light FMEA on wet-floor riskA Class A office lobby becomes slippery during rain. The current process is reactive: the day porter mops visible water when they notice it, and signs are stored in the janitor closet 80 feet away. FMEA: identify the failure mode, effect, cause, current detection, and control before the failure harms the customer or worker. The common trap is treating wet floors as a cleanup task only. In a public lobby, wet floors are also a risk-control system with timing, detection, signage, mats, and response ownership. Function Keep lobby walking surfaces dry, visible, and safe during weather spikes while maintaining tenant…
5 minCommit to a daily one-page risk notedaily one-page commodity risk note a live commodity book with price, basis, freight, credit, or operational exposure that can change within two days Plan: exposure and objective. Do: action taken or held. Check: price, basis, logistics, credit, and ops changes. Act: hedge, resize, escalate, or leave unchanged with trigger. In 2 days, check whether the note changed a hedge, quote, escalation, or no-trade decision. Before the 4:30 p.m. risk call on a cargo with open basis and freight exposure. After a hedge is resized and the residual exposure needs an owner. When a counterparty asks for payment terms that change…
5 minChallenge a limit breach without turning it into theaterDarius D Senior gas trader 1 Name 2 Authority 3 Contain Risk exception 5 min Limit breach Darius increased exposure after a stop was hit and wants to defend the market view. The manager must keep the conversation on appetite and control. 20% added size $420k stop breach
5 minWrite the mandate before the market viewThe move: define the trading job before defending the view. ISO 31000 starts with context because risk only makes sense against objectives. In commodity trading, that means naming the job the trade is supposed to do: hedge inventory, capture basis, secure supply, monetize storage, or express a directional view within a limit. The practical test is whether another trader could read your mandate and know what would make the trade invalid. If the statement only says "bullish copper" or "cheap freight", it has no risk criteria. If it says "hedge 40% of August cathode purchases if LME breaks above the…
5 minWalk a margin-call liquidity squeezeLiquidity squeeze The hedge is tied to physical supply, but cash margin is due before physical cash arrives. The risk has shifted from final economics to funding the path. COSO ERM Risk appetite includes survival constraints Performance goals do not matter if the desk cannot fund the path to convergence. Shortcut Argue the market view and hope treasury catches up. The firm protects convergence without pretending cash timing is irrelevant. When cash timing becomes the constraint, liquidity is the trade. Mandate Separate exposure The short futures hedge is linked to physical purchases, but there is also an unrelated short put…
5 minWalk a new-crop origination decisionOrigination pressure The cooperative wants a fast answer on 18kt new-crop corn. Basis is attractive, but demand and rail are not firm. The risk is not only price. It is committing volume before the physical chain can absorb it. ISO 31000 in a trade Context -> risks -> treatment -> monitoring A physical deal becomes safer when each commitment is linked to a treated risk source. Shortcut Take cheap volume first and solve logistics later. Commitment scales with evidence instead of excitement. Size the physical commitment to the weakest confirmed link in the chain. Context Start You can buy 18kt…
5 minSort the book by exposure typeSort each item into the exposure bucket it belongs to. Outright price Basis/differential FX/finance Credit/operational Front-month futures price moves against inventory Physical premium widens versus exchange reference EUR invoice paid against USD hedge book Buyer LC not yet confirmed by approved bank Regional gas hub spread moves away from Henry Hub Storage financing extends from 30 to 55 days Assay documents not ready before title transfer Unhedged long futures left after physical sale
5 minPremortem a storage trade before it looks obviousA gasoil storage trade shows $4.20/mt positive carry after tank rent. The desk wants to commit 30kt for 60 days. Premortem: assume failure, list plausible causes, convert causes into controls before commitment. The common trap is treating positive spread economics as proof that operational and exit assumptions are stable. State the imagined failure Assume the trade lost $1.5m in 60 days despite positive contango. The failure statement breaks the approval-room pressure to sound supportive. List causes Tank not ready, quality drifts, financing cost jumps, exit window congested, hedge roll slips. The list should include non-price paths, not only spread movement.…
5 minKeep the human accountableThe move: make ownership visible before AI makes the work look finished. RACI is a simple role map: Responsible does the work, Accountable owns the outcome, Consulted gives input, and Informed needs visibility. When AI enters the workflow, the danger is not only inaccurate text. The danger is an accountability blur. A model can draft, summarize, compare, and suggest. It cannot carry professional responsibility for the decision. That distinction changes how you work. If AI drafts a customer response, a named human still checks tone, policy, and facts. If AI summarizes interview notes, a named human still checks consent and…
5 minThe plausible but uncited answerYou have a polished AI paragraph about a new compliance requirement, but the answer gives no source and the claim affects a board memo.
5 minThe AI use traffic lightTraffic light GYR What do Green, Yellow, and Red mean for AI use? Flip to expand the traffic-light rule. Green vs Yellow What separates a Green AI task from a Yellow one? Yellow does not ban AI; it changes the human review requirement. Objection We are in a hurry. Can't AI just answer? The task involves a customer promise or policy interpretation. Your line AI can help prepare the checklist or options, but the accountable human needs to make the call. Urgency can make a red or yellow task look green. The line preserves speed while keeping judgment with the…
4 minSpot control risk before it hardensWeek four The contractor is now in daily standup, receives sprint tickets directly, and uses broad internal tooling. The pattern is becoming normal before anyone has reviewed it. Control scan Direction -> Tools -> Relationship Look for facts that show who controls the method, what resources are used, and whether the relationship looks bounded. Ignore They are doing good work You redesign before habits become the operating model. When method control rises, redesign the engagement or escalate the labor channel. 01 Direction 02 Tools 03 Duration Signal 1 The manager assigns sprint tickets directly to the contractor each morning.
5 minBuild a vendor issue risk registerVendor X missed start dates on four of nine roles because compliance packets arrived incomplete. Risk register entry: risk statement, cause, trigger, owner, response, evidence. The common trap is treating each late start as a one-off escalation. That creates noise without changing the conditions that produce the next miss. State the risk Vendor X may miss confirmed start dates for regulated roles because pre-start compliance packets arrive incomplete. A risk statement links uncertainty, event, and cause instead of just naming irritation. Define trigger Trigger: any candidate packet is incomplete five business days before start. The trigger tells the team when…
5 minCommit to one obligation ownerAssign ownership and evidence to one unmanaged contract obligation. Use an obligation that currently lives only in clause text, a Slack thread, or someone’s memory. For [obligation name], [owner] will [specific contract action] by [time or cadence], measured by [evidence artifact], reviewed by [internal monitor], with escalation to [person/path] if the obligation is late, incomplete, or disputed. In 3 days, review whether the contract action happened and what evidence changed. A renewal where the supplier missed a service credit and the business owner wants to ignore it A customer contract waiting on one redline owner before quarter close A new…
5 minCommit to a renewal auditAudit one active renewal notice and add the missing decision controls. Pick a real supplier or customer contract with a renewal, extension, or termination notice date. For [contract name], I will update the renewal control by [date] with: notice deadline, business decision owner, usage or value evidence owner, supplier contact, draft notice sender, and the internal decision deadline at least two weeks before notice is due. In 3 days, review whether the contract action happened and what evidence changed. A renewal where the supplier missed a service credit and the business owner wants to ignore it A customer contract waiting…
5 minThe vague acceptance clauseThe SOW has subjective acceptance language and the team needs a usable standard.
5 minThe renewal clockAuto-renewal is three days away and the business owner has not decided.
5 minThe side-letter shortcutA project lead wants to confirm a changed acceptance date by email outside the amendment process.
5 minThe unlimited liability askA customer demands unlimited liability for all service-related losses before signature.
5 minWalk a change orderContract moment A customer asks the team to add work midstream and assumes it is included. The wrong branch creates either delay, leakage, or a relationship problem. Decision walk Request, impact, authority, record Controlled change keeps generosity from becoming unmanaged obligation. Shortcut React to the loudest issue A decision that survives handoff. Request 01 Two new integrations are requested in a standup. What is the first contract-management move? Impact 02 Delivery says each integration adds five days and new test cases. What impact should you document? Authority
5 min