Risk Management

Identifying, assessing, and mitigating business risks including operational, financial, and strategic threats. Develops contingency plans, establishes controls, and ensures organizational resilience through proactive risk monitoring.

Lesson previews

Report the test result honestly

The app restored within target, but a payment integration was mocked and three manual workarounds were needed. The board update needs one status line.

5 min
Sort recovery controls by job

Place each control into the role it primarily plays during disaster recovery. Preventive control Detective control Recovery control Communication control Immutable backup retention that administrators cannot silently delete Replication-lag alert when standby database is more than 10 minutes behind Documented and tested database promotion command for the DR region Pre-approved customer status template for regional service outage Quarterly check that break-glass accounts still work Network segmentation that stops backup servers from being reached by user workstations Clean-room restore procedure for suspected ransomware recovery Executive update cadence with known owner and required facts

5 min
Tier a service from impact, not volume

The trap A high-traffic homepage is labeled Tier 1 while licensing is Tier 3 because it is quiet. Traffic volume can hide dependency impact. The model Impact over time Tiering starts with how fast impact becomes unacceptable, then checks dependency blast radius and workaround strength. Weak shortcut Rank by traffic or owner pressure. A tier that explains why it deserves the DR spend. Assign the tier to the business consequence, then design the recovery pattern to match. 01 Impact 02 Dependency 03 Try First read Licensing has low traffic but blocks every paid session after token expiry.

5 min
Price the risk, not just the pile

The move: treat the quote as a risk scan, not just a volume estimate. Failure Mode Ask how the job can behave differently than the photos suggest. A small pile can be heavy. A simple couch can become a door-removal problem. A clean garage can hide restricted chemicals. Effect Name what the failure mode does to labor, safety, customer trust, route timing, or disposal cost. If the effect changes the job economics, it must be visible before price commitment. Detection Ask whether the failure mode can be detected on the phone, by photo, or during arrival walk-through. The later you…

5 min
Run FMEA on a two-truck morning

The dispatcher must release two trucks without letting a charity cutoff, early crew departure, or heavy-item job break the route. FMEA route scan: function → failure mode → effect → priority → control The common shortcut is routing only by map distance. Geography matters, but it misses operational failure modes such as facility cutoffs, crew capacity, and hard-to-detect access constraints. Define function Truck 1 and Truck 2 must complete six pickups, one donation drop before 11:30, and one disposal run before 3:00. FMEA starts by naming what the process must accomplish. Without that, every inconvenience looks equally important. List failure…

5 min
Rescue the Aging Card

Live board signal A payments bug has been in Test for nine calendar days. The team average is three, the release train leaves Friday, and everyone keeps saying it is 'basically done.' Work item age is an early-warning metric: the longer active work has already waited, the more deliberately you inspect its remaining risk. The Kanban Guide: Work Item Age Signal -> Policy -> Flow Action Age changes the conversation from sentiment to evidence. Cycle time tells you how long finished items took; work item age tells you how risky unfinished items are right now. When a card is older…

5 min
Make the rain-delay call before the route collapses

Weather risk A midday storm may hit while one crew has an open trench and another crew is halfway through maintenance visits. The cost of a weather miss depends on both probability and consequence. Risk matrix Likelihood x impact -> response Use the matrix to match the size of the response to the size of the risk. The answer is not always cancel or continue. Wait and see Easy in the morning, expensive after the site is exposed. A proportionate decision before crews are trapped by conditions. The same forecast deserves different action when the site consequence changes. 01 Classify…

5 min
Sort field risks by the response they deserve

Classify each field condition by the response it deserves before work proceeds. Monitor Mitigate before continuing Escalate to manager Stop work until cleared Wet turf on a routine mow route with no slope or equipment hazard Dark clouds two hours away from non-critical bed cleanup Heat advisory during a full-sun mulch install Wet paver walkway used for carrying loaded wheelbarrows Loose dog in a fenced backyard the crew must enter Neighbor disputes the property line during bed edging No utility marks for a requested trench extension Crew member shows dizziness and confusion in high heat

5 min
Run an after-action review after a blown deadline

A filing was completed minutes before the deadline, but the team had no final client review, no clear exhibit owner, and no protected partner review window. After Action Review: compare intended results with actual results, identify why the gap occurred, and define what to sustain or change next time. The common trap is treating survival as success. If the filing made it, the team moves on, but the unmanaged system that created the near miss remains intact. Intended result We intended to file by 10 p.m., with final client exhibit approval by 6 p.m. and partner review complete by 8…

5 min
Use RACI to close the conflict-check handoff

A new private equity matter needs conflicts clearance in three hours, but intake, the partner, conflicts, and billing all think someone else owns the next move. RACI: Responsible does the work, Accountable owns the final outcome, Consulted gives needed input, Informed receives status. The common trap is treating a large cc line as coordination. It feels transparent, but it creates duplicate nudges, hidden blockers, and no single person with authority to close the loop. List the deliverable Define the exact output: conflicts clearance decision for Client Meridian on Project Lark by 11:30 a.m. RACI starts with a deliverable, not a…

5 min
Premortem the fixed-fee proposal

Before the quote A client asks for a fixed fee on a document-heavy regulatory response. The team has two hours to send a number. Fast pricing without risk imagination can turn a profitable client win into a quiet write-off. Premortem Assume the matter failed; ask what caused it. The premortem makes dissent useful before commitment. It helps the team find hidden assumptions and convert them into proposal safeguards. Optimism The number should work if things go normally. The proposal is clearer and the client sees what the fixed fee actually covers. Every serious pricing assumption deserves a visible safeguard. 01…

5 min
Protect learning in the missed-filing conversation

A filing went in 22 minutes late. The team is waiting for the partner's reaction. Before: the partner says how could this happen, and the associate gives the shortest self-protective version. After: the partner says we need the exact sequence so we can protect the client and fix the process. The team surfaces a docketing handoff gap and corrects the client notice within the hour. Fact safety is a risk-control tool.

5 min
Make risks safe to raise before they become claims

The move: reward the flag before you investigate the fault. Psychological safety does not mean everyone is comfortable all the time. It means people believe they can take interpersonal risks in service of the work: ask the question, admit the miss, challenge the assumption, or flag the near-miss. Law firms need this because quality control depends on early information from people who may have less status than the partner making the call. Make the ask explicit Do not assume people know you want bad news early. Say it: I would rather hear an uncertain risk now than a confirmed problem…

5 min
Choose the right escalation on a troubled matter

A matter is off budget and scope is expanding while the lead partner is unavailable. The team needs a fast decision on whether to approve added work, narrow scope, or pause.

5 min
Pre-mortem the trial plan

01 Invite risk 02 Convert 03 Fresh trial Six weeks out The team is confident, but one weak expert assumption could change the entire damages story. The moment to hear that is before the trial plan becomes identity. Pre-mortem lens Assume failure early enough to prevent it The pre-mortem works by giving the team permission to name what optimism suppresses, then turning those failure modes into controls. Reflex Ask for confidence and get performance The team changes the plan before the weakness becomes public. The pre-mortem is not pessimism. It is a structured way to make candor useful while change…

5 min
Make the preservation call before collection

The issue is not whether to act quickly. The issue is which fast action protects evidence while keeping later review scope defensible.

5 min
Score failure modes before you spend

The most expensive risk is often the one nobody is measuring. FMEA helps a team look at a process before failure happens. Instead of asking only, "What are we worried about?" it asks three stronger questions: how serious would the failure be, how likely is it, and would we detect it before harm occurs? Translate FMEA into litigation A litigation matter has many failure modes: missed custodians, inconsistent public statements, unsupported damages, unmanaged expert assumptions, weak privilege calls, budget surprise, late settlement authority, or a deposition witness who has never seen the key documents. These are not equal risks. Why…

5 min
Build a litigation risk register

The team has many litigation worries, but the status call does not convert them into ranked work. FMEA-style risk register: failure mode -> effect -> likelihood -> detection/control -> owner -> trigger Writing broad risk labels like 'expert problem' or 'discovery risk' creates the feeling of discipline without giving anyone a controllable next move. Before Expert risk; discovery risk; budget risk; settlement risk. Discuss next week. After Failure mode: damages expert cannot tie churn assumption to source data. Effect: cross-exam credibility loss. Control: source-data audit by Thursday. Owner: Priya. Trigger: revise report or brief settlement authority by Friday. Name the…

5 min
Keep a legal red flag in the deal conversation

Sofia SL Deal counsel L Likelihood I Impact O Options Red flag 30 sec The warning Sofia says, "We may have a data-transfer problem in two EU customer contracts." A vague legal warning can either freeze the process or get ignored. Both are dangerous. 2 contracts flagged $3.2M ARR potentially affected

5 min
Route red flags before reacting

Legal finds that 18% of target revenue may require customer consent before contracts can transfer. Closing is nine days away.

5 min
Place M&A risks on the matrix

Likelihood Impact Lower likelihood Higher likelihood Lower impact Higher impact Protect or pause High impact, higher likelihood Examples: likely top-customer churn, confirmed regulatory breach, or critical system instability. Response: senior review, mitigation, price adjustment, condition, escrow, or pause. tl Scenario-plan High impact, lower likelihood Examples: possible litigation trigger or uncertain customer consent. Response: evidence request, scenario model, and contractual protection if probability increases. tr Monitor Lower impact, lower likelihood Examples: small vendor renewal ambiguity or immaterial policy gap. Response: assign owner, monitor, and avoid overloading committee time. bl

4 min
Use FMEA to rank PM tasks

A four-hour PM window cannot hold 47 tasks. The team must decide what stays, changes, or moves. FMEA PM review: identify the failure mode, estimate severity, occurrence, and detection, then choose the control that reduces risk. Cutting the easiest or oldest PM tasks first may remove work that catches severe hidden failures. FMEA risk lens Failure mode What specific failure does this task control? Effect What happens if the failure reaches the process? Controls How likely is it and how easily is it detected now? Decision Keep, change, move, or remove the task based on risk. Name the failure mode…

5 min
The pump is hot, production wants it tomorrow

Pump P-204 is hot, critical, and weakly backed up. Decide how to plan the next move before production pressure turns into blind deferral.

5 min
Place risks on an impact-control matrix

Planning control Operational impact Low control High control Low impact High impact Escalate or contingency High impact · Low planning control Example: vendor specialist may miss the shutdown. Planning cannot fix it alone, so escalate the decision, build contingency, and protect communication. tl Act now High impact · High planning control Example: critical pump has rising vibration and no standby. Stage parts, secure access, plan condition checks, and set escalation triggers. tr Monitor or park Low impact · Low planning control Example: cosmetic paint damage in an area scheduled for renovation. Track it, but do not let it consume planning…

5 min