Skip to main content
BUDGETING5 MIN READ

Build a Support Cost Forecast

Build a support cost forecast from activity drivers and identify which variance signals update the model.

Forecast next month's support labor. Expected tickets: 42,000. Handle time: 8 minutes per ticket. Productive capacity: 6,000 minutes per agent per month. Loaded labor cost: $5,800 per agent. Automation may reduce handle time to 7.2 minutes. Required agents = (ticket volume x handle time) / productive minutes per agent. Labor budget = required agents x loaded labor cost. The common shortcut is to hire based only on ticket growth. That ignores productivity, automation, and service design. Demand minutes 42,000 tickets x 8 minutes = 336,000 required minutes Ticket volume becomes a labor requirement only after handle time is applied. Agent…

Read the full lesson

Sign up free — one personalized lesson every day, matched to your role and goals.

Already have an account? Sign in

← Back to library
Contact us